?:linkContext
|
-
EVANS J.A., KUNDA G. and BARLEY S.R. (2004) Beach time, bridge time, and billable hours: the temporal structure of technical contracting, Administrative Science Quarterly, 49, 1-38.
(xsd:string)
-
Evans, J./Kunda, G./Barley, S. (2004): Beach Time, Bridge Time, and Billable Hours: The Temporal Structure of Technical Contracting. In: Administrative Science Quarterly, 49: 1-38.
(xsd:string)
|
?:name
|
-
Evans, J. K., G./Barley, S., S.R, B. A. R. (2004). Beach Time, Bridge Time, and Billable Hours: The Temporal Structure of Technical Contracting. Administrative Science Quarterly, 49 pp. 1-38.
(xsd:string)
|